Changes between Version 5 and Version 6 of docs/CommissioningPlan/P3.13
- Timestamp:
- 02/04/21 22:52:28 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.13
v5 v6 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 4 hours6 • **Duration** : 2 nights 7 7 **Description** 8 8 • This activity will center the long slit. … … 11 11 • Authorize SHARK-NIR on the SX side. 12 12 **Procedure** 13 • Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit or TBD????? [This procedure is not complete. we need to work on this.] 13 • Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit. 14 * TBD 14 15 **Success criteria** 15 16 • xxx 16 17 **Notes** 18 17 19 **LBTO support** 18 20 • SOUL-AO support