     1 == P3.13       Center the slit ==
     2•       **Phase**               :       3 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Nighttime testing (functionality and operability) (C4)
     5•       **Recurrence**  :       once at commissioning
     6•       **Duration**            :       40 minutes
     7**Description**
     8•       This activity will center the long slit.
     9**Prerequisites**
     10•       Atmospheric conditions: AO working conditions.
     11•       Authorize SHARK-NIR on the SX side.
     12**Procedure**
     13•       Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit or TBD?????
     14**Success criteria**
     15•       xxx
     16**Notes**
     17**LBTO support**
     18•       Support from LBTI/LBTO?
     19**Associated SHARK-NIR personnel**
     20•       JF, LM, MdP
     21**Date performed and by whom**