wiki:docs/CommissioningPlan/P3.12

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P3.12 Checking field-stabilized mode/bearing rotation service

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C4)
  • Recurrence : once at commissioning
  • Duration : 40 minutes

Description

  • The field stabilized mode or in other words, the working of the bearing tracking service will be tested.

Prerequisites

  • Atmospheric conditions: AO working conditions.
  • Authorize SHARK-NIR on the SX side.
  • Targets (star cluster) near zenith and horizon (say airmass of 2).

Procedure

  • Select the target near airmass 2. There should be stars spread across the entire SCICAM, preferably close to the edges as well.
  • Start the bearing tracking services (field-stabilized mode).
  • Take short-exposure images for a duration of ##minutes.
  • Check if the positions of these stars.
  • Repeat the same for the target close to the zenith.
  • The above may be repeated for a target where the rotation of the bearing is in the opposite direction as of the above tested one.

Success criteria

  • The bearing tracking service works well and the field is stabilized within the precision needed.

Notes LBTO support

  • Support from LBTI/LBTO?

Associated SHARK-NIR personnel

  • JF, LM, MdP

Date performed and by whom