Changes between Version 6 and Version 7 of docs/CommissioningPlan/P3.12
- Timestamp:
- 02/04/21 22:51:21 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.12
v6 v7 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime calibration (C5)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 5 5 • **Recurrence** : on every target, starting from commissioning. 6 • **Duration** : 2 .5hours6 • **Duration** : 2 hours 7 7 **Description** 8 8 • This calibration is performed to calibrate the target star center with respect to the detector in order to provide a reference input for frame derotation and quadrant combination.