Changes between Version 6 and Version 7 of docs/CommissioningPlan/P3.12


Ignore:
Timestamp:
02/04/21 22:51:21 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.12

    v6 v7  
    22•       **Phase**               :       3 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime calibration (C5)
     4•       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
    55•       **Recurrence**  :       on every target, starting from commissioning.
    6 •       **Duration**            :       2.5 hours
     6•       **Duration**            :       2 hours
    77**Description**
    88•       This calibration is performed to calibrate the target star center with respect to the detector in order to provide a reference input for frame derotation and quadrant combination.