Changes between Version 15 and Version 16 of docs/CommissioningPlan/P3.12


Ignore:
Timestamp:
04/22/22 20:52:31 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.12

    v15 v16  
    1 == P3.12        Astrometry plate scale and orientation ==
    2 
     1== P3.12        Distortion map ==
     2 
    33- **Phase**             :       3 
    44- **Status**            :       Draft   
    55- **Category**  :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
    6 - **Recurrence**        :       every night starting from commissioning
     6- **Recurrence**        :       once every week starting from commissioning + on request.
    77- **Duration**  :       2 hours
    88
    99**Description**
    10 - Determine the astrometry of the science frame. Deduce detector on sky coordinates & plate scale from RA & DEC of known multiple stellar systems. This calibration is to be done for a reference setup.
     10- Determine distortion map of science frame. Monitor distortion coefficient with time (weekly calibration) and measure the precise distortion of a given observation in any setup, if requested.
    1111
    1212**Prerequisites**
     
    1616
    1717**Procedure**
    18 - Observe multiple systems with known characteristics without the coronagraph
     18- Observe a dense field (e.g., a globular cluster) with accurate HST astrometry and a guide star bright enough (mag F860W < 11).
    1919
    2020**Templates**
    21 - SHARKNIR_cal_Astrometry (not released)
     21- SHARKNIR_gen_mon_DistortionMap (not released)
    2222
    2323**Success criteria**
    24 - Image scale better than 5 mas (goal 0.5 mas) over FoV, image orientation better than 3 arcmins (goal 18 arcsec)
     24- Better than 1 mas over FoV.
    2525
    2626**Notes**
    27 - Same as activity 7.1 in AD4
     27- Same as activity 9.6 in AD4
    2828
    2929**LBTO support**