Changes between Version 11 and Version 12 of docs/CommissioningPlan/P3.12


Ignore:
Timestamp:
05/17/21 11:21:13 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.12

    v11 v12  
    44•       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
    55•       **Recurrence**  :       on every target, starting from commissioning.
    6 •       **Duration**            :       1 night
     6•       **Duration**            :       2 days
    77**Description**
    88•       This calibration is performed to calibrate the target star center with respect to the detector in order to provide a reference input for frame derotation and quadrant combination.