v5 v6 1 == P3.11 Check the acquisition procedure == 2 • **Phase** : 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C5) 5 • **Recurrence** : once at commissioning 6 • **Duration** : 4 hours 1 == P3.11 Sky background == 2 3 - **Phase** : 3 4 - **Status** : Draft 5 - **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 6 - **Recurrence** : once at commissioning and then on request. 7 - **Duration** : 2 hours 8 7 9 **Description** 8 • Verify the acquisition sequence for SHARK-NIR 10 - Acquire a series of sky backgrounds from science images. A short sky background may also be useful for remaining deviant pixel removal. 11 9 12 **Prerequisites** 10 • Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?).11 • Authorize SHARK-NIR on the SX side. 12 • Suitable bright enough target (including the possibility of performing AO). 13 - Authorize SHARK-NIR on the SX side. 14 - Atmospheric conditions: AO working conditions??? 15 13 16 **Procedure** 14 • Start the acquisition sequence: collimating the telescope to reduce the aberrations, close the loop and produce better ASM flat, NCPA estimation using phase-diversity algorithm, close SHARK-NIR tip-tilt+NCPA loop, and check the PSF quality at SCICAM. 15 • Save telemetry (open and closed loop of the ALPAO DM). 17 - Observe a blank field close to the science target (separation~10-20 arcsec) 18 - The same set-up as nighttime science observations, but AO is not running, and the coronagraph may be removed. A list of telescope offsets is added to reach an “empty” field and jitter. 19 20 **Templates** 21 16 22 **Success criteria** 17 • Successful acquisition sequence. 23 - 10% accuracy (dependent on measurement frequency) 24 18 25 **Notes** 26 - Same as activity 7.6 in AD4 27 19 28 **LBTO support** 20 • AO support21 22 **Associated SHARK-NIR personnel**23 29 24 30 **Date performed and by whom**