Changes between Version 2 and Version 3 of docs/CommissioningPlan/P3.11
- Timestamp:
- 02/04/21 22:49:59 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.11
v2 v3 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 2 hours6 • **Duration** : 2 nights 7 7 **Description** 8 8 • Verify the acquisition sequence for SHARK-NIR 9 9 **Prerequisites** 10 • Atmospheric conditions: should be able to see b ight stars onsky (preferably close to zenith?).10 • Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?). 11 11 • Authorize SHARK-NIR on the SX side. 12 12 • Suitable bright enough target (including the possibility of performing AO).