Changes between Version 4 and Version 5 of docs/CommissioningPlan/P3.10


Ignore:
Timestamp:
01/21/21 19:34:12 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.10

    v4 v5  
    1515
    1616**Procedure**
    17 •       Acquire star of given magnitude. Start SOUL-AO.
    18 * Check the working and performance of the NCPA baseline approach. Take images at SCICAM.
    19 * Check the phase diversity approach using Wollaston prism + DI-DBI. Take images at SCICAM.
    20 * Check the phase diversity approach (using the internal calibration source). Take images at SCICAM.
    21 * Repeat for a different star (of different magnitudes and for different elevation of the telescope)
     17•       Acquire star of a given magnitude. Start SOUL-AO.
     18* Check the working and performance of the NCPA (already calibrated) baseline approach. Take images at SCICAM.
     19* Check the phase diversity NCPA approach using Wollaston prism + DI-DBI (need to do on the spot, but script exists). Take images at SCICAM.
     20* Check the phase diversity approach using the internal calibration source (already calibrated). Take images at SCICAM.
     21* Repeat for a different star (of different magnitudes and for a different elevation of the telescope). It is also good to do this for different seeing conditions.
    2222
    2323**Success criteria**