Changes between Version 19 and Version 20 of docs/CommissioningPlan/P3.10
- Timestamp:
- 04/22/22 20:49:37 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.10
v19 v20 1 == P3.10 Check the acquisition procedure==2 1 == P3.10 Sky background == 2 3 3 - **Phase** : 3 4 4 - **Status** : Draft 5 - **Category** : Nighttime testing (functionality and operability) (C5) 6 - **Recurrence** : once at commissioning 7 - **Duration** : 4hours5 - **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 6 - **Recurrence** : once at commissioning and then on request. 7 - **Duration** : 2 hours 8 8 9 9 **Description** 10 - Verify the acquisition sequence for SHARK-NIR10 - Acquire a series of sky backgrounds from science images. A short sky background may also be useful for remaining deviant pixel removal. 11 11 12 12 **Prerequisites** 13 - Atmospheric conditions: should be able to see bright stars in the sky (preferably close to zenith?).14 13 - Authorize SHARK-NIR on the SX side. 15 - Suitable bright enough target (including the possibility of performing AO).14 - Atmospheric conditions: AO working conditions??? 16 15 17 16 **Procedure** 18 - Start the acquisition sequence: collimating the telescope to reduce the aberrations, close the loop and produce better ASM flat, NCPA estimation using phase-diversity algorithm, close SHARK-NIR tip-tilt+NCPA loop, and check the PSF quality at SCICAM.19 - Save telemetry (open and closed loop of the ALPAO DM).17 - Observe a blank field close to the science target (separation~10-20 arcsec) 18 - The same set-up as nighttime science observations, but AO is not running, and the coronagraph may be removed. A list of telescope offsets is added to reach an “empty” field and jitter. 20 19 21 20 **Templates** 22 - SHARKNIR_ci_acq (not released) - coronagraphic mode 23 - SHARKNIR_di_acq (not released) - direct imaging mode 24 - SHARKNIR_lss_acq (not released) - long slit spectroscopy mode 21 - SHARKNIR_cal_SkyBackground (not released) 25 22 26 23 **Success criteria** 27 - Successful acquisition sequence.24 - 10% accuracy (dependent on measurement frequency) 28 25 29 26 **Notes** 27 - Same as activity 7.6 in AD4 30 28 31 29 **LBTO support** 32 - AO support33 30 34 31 **Date performed and by whom**