    v11 v12  
    44•       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       3.5 nights
     6•       **Duration**            :       3 nights
    77**Description**
    88•       Evaluate the NCPA working and performance using the baseline approach, phase-diversity approach using the Wollaston prism & dual-band imaging, and measurement of NCPA using SHARK-NIR internal calibration sources.