Changes between Version 9 and Version 10 of docs/CommissioningPlan/P3.10
- Timestamp:
- 02/04/21 22:49:24 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.10
v9 v10 2 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C 4)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 12 hours6 • **Duration** : 3.5 nights 7 7 **Description** 8 8 • Evaluate the NCPA working and performance using the baseline approach, phase-diversity approach using the Wollaston prism & dual-band imaging, and measurement of NCPA using SHARK-NIR internal calibration sources. 9 9 10 10 **Prerequisites** 11 • Atmospheric conditions: ?11 • Atmospheric conditions: TBD 12 12 • Authorize SHARK-NIR on the SX side. 13 13 • AO working.