Changes between Version 5 and Version 6 of docs/CommissioningPlan/P2.9
- Timestamp:
- 01/26/21 16:50:28 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.9
v5 v6 32 32 **Comments** 33 33 34 MB: not sure changing elevation vel and acc is doable, but even if not sure it makes sense. At night we will not be able to control this, so i would say it is betetr to leave the standard parameters 34 MB: not sure changing elevation vel and acc is doable, but even if not sure it makes sense. At night we will not be able to control this, so i would say it is betetr to leave the standard parameters [yes, it is possible. i have done it talking to mountain manager for LN.] 35 35 36 MB: concerning RR flexures, from arcetri videocon you need to keep the loop closed while going down, so this might not be optimal for us, as it means mirrors are shifted...let's discuss again 36 MB: concerning RR flexures, from arcetri videocon you need to keep the loop closed while going down, so this might not be optimal for us, as it means mirrors are shifted...let's discuss again [ yeah, need discussion]