Changes between Version 25 and Version 26 of docs/CommissioningPlan/P2.9
- Timestamp:
- 10/12/23 11:09:26 (13 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.9
v25 v26 25 25 - Accuracy < 10 mas (goal 5 mas) 26 26 - A report of the activity performed during daytime tests on 15, 20, and 21 of December 2022 using SHARK-NIR coupled with the M2 adaptive secondary mirror (ASM) of LBT can be found in this [https://docs.google.com/document/d/1vnRdx8hAINpr0Wz2YMvTYQotcwfshbDo/edit link] 27 - This activity was repeated on-sky during Com-2. You will find some details in the minutes of the run. 27 28 28 29 **Notes**