Changes between Version 25 and Version 26 of docs/CommissioningPlan/P2.9


Ignore:
Timestamp:
10/12/23 11:09:26 (13 months ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.9

    v25 v26  
    2525- Accuracy < 10 mas (goal 5 mas)
    2626- A report of the activity performed during daytime tests on 15, 20, and 21 of December 2022 using SHARK-NIR coupled with the M2 adaptive secondary mirror (ASM) of LBT can be found in this [https://docs.google.com/document/d/1vnRdx8hAINpr0Wz2YMvTYQotcwfshbDo/edit link]
     27- This activity was repeated on-sky during Com-2. You will find some details in the minutes of the run.
    2728
    2829**Notes**