    2424**Success criteria**
    2525- Accuracy < 10 mas (goal 5 mas)
    26 - A report of the activity performed can be found in this [https://docs.google.com/document/d/1vnRdx8hAINpr0Wz2YMvTYQotcwfshbDo/edit link]
     26- A report of the activity performed during daytime tests on 15, 20, and 21 of December 2022 using SHARK-NIR coupled with the M2 adaptive secondary mirror (ASM) of LBT can be found in this [https://docs.google.com/document/d/1vnRdx8hAINpr0Wz2YMvTYQotcwfshbDo/edit link]
    2727
    2828**Notes**