Changes between Version 23 and Version 24 of docs/CommissioningPlan/P2.9
- Timestamp:
- 10/12/23 11:06:30 (13 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.9
v23 v24 17 17 - The required specifications are the presence of at least four satellite spots placed symmetrically to the star, at separation within 5 and 15 lambda/D, with FWHM < 45 mas and separation precision < 6 mas. 18 18 - Find the centroids of the spots and fit a circle to them. The center of the circle is the extrapolated star position behind the coronagraph. 19 - The detailed sequence of tests is described in [https://docs.google.com/document/d/18j3rBLl6Z4qZXMq1UN-AXKVImgvY4kB7F6lc0gne8m4/edit ]19 - The detailed sequence of tests is described in [https://docs.google.com/document/d/18j3rBLl6Z4qZXMq1UN-AXKVImgvY4kB7F6lc0gne8m4/edit link] 20 20 21 21 **Templates** … … 24 24 **Success criteria** 25 25 - Accuracy < 10 mas (goal 5 mas) 26 - A report of the activity performed can be found in this [https://docs.google.com/document/d/1vnRdx8hAINpr0Wz2YMvTYQotcwfshbDo/edit link] 26 27 27 28 **Notes**