    1  == P2.9 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM==
     1 == P2.9 Star center Fourier mode images ==
    22 
    33- **Phase**             :       2 
    44- **Status**            :       Draft   
    5 - **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    6 - **Recurrence**        :       once at commissioning
    7 - **Duration**  :       3 days
     5- **Category**  :       Daytime testing (functionality and operability) (C3)
     6- **Recurrence**        :       once after instrument installation at telescope platform
     7- **Duration**  :       0.5 day
    88
    99**Description**
    10 - Verify the efficiency of the mask-centering algorithm and the final contrast with SOUL-AO and artificial turbulence intruded at the ASM.
     10- This calibration is performed to calibrate the target star center with respect to the detector in order to provide a reference input for frame derotation and quadrant combination.
    1111
    1212**Prerequisites**
    13 - RR is mounted on the SX side.
     13- Authorize SHARK-NIR on the SX side.
     14- Atmospheric conditions: AO working conditions.
     15- Bad pixel map, Dark
    1416
    1517**Procedure**
    16 - TBW
     18- TBW+TBC
     19- DM (ASM/ALPAO-DM?) produces a pattern offset with four spots symmetric with respect to the star + AO closed-loop + coronagraph
     20- The required specifications of the corresponding image are a grid of at least 2x2 regularly spaced focal plane image peaks within 5 and 15 lambda/D with FWHM < 45 mas and separation precision < 6 mas.
     21- DM offset applied on target acquisition to produce a waffle image. Find the center of the four first-order diffraction peaks (cross geometry) to deduce the pixel corresponding to the center field.
    1722
    1823**Templates**
     24- SHARKNIR_gen_cal_StarCenter (not released)
    1925
    2026**Success criteria**
    21 - Final contrast produced for various seeing conditions matches the simulations.
     27- Accuracy of 3 mas (goal 1 mas)
    2228
    2329**Notes**
     30- Same as activity 7.8 in AD4
    2431
    2532**LBTO support**
    26 - Authorize SHARK-NIR on the SX side.
    27 - RR is mounted on the SX side.
    2833- AO support
    2934