     1 == P2.9 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM==
     2 
     3- **Phase**             :       2 
     4- **Status**            :       Draft   
     5- **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
     6- **Recurrence**        :       once at commissioning
     7- **Duration**  :       3 days
     8
     9**Description**
     10- Verify the efficiency of the mask-centering algorithm and the final contrast with SOUL-AO and artificial turbulence intruded at the ASM.
     11
     12**Prerequisites**
     13- RR is mounted on the SX side.
     14
     15**Procedure**
     16- TBW
     17
     18**Templates**
     19
     20**Success criteria**
     21- Final contrast produced for various seeing conditions matches the simulations.
     22
     23**Notes**
     24
     25**LBTO support**
     26- Authorize SHARK-NIR on the SX side.
     27- RR is mounted on the SX side.
     28- AO support
     29
     30**Date performed and by whom**