    1 == P2.9 Science detector calibrations (on the telescope)==
    2 
    3 - **Phase**             :       2 
    4 - **Status**            :       Draft   
    5 - **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    6 - **Recurrence**        :       on a regular basis as per the requirement
    7 - **Duration**  :       1 day
    8 
    9 **Description**
    10 - After installing the SHARK-NIR at the LBT platform, the science detector is tested for all its read-out modes, windowing possibilities. Also, some of the calibration scripts are rechecked.
    11 
    12 **Prerequisites**
    13 - SCICAM cooled down.
    14 
    15 **Procedure**
    16 - Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom or at Padova cleanroom. Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details.
    17 ||**Code**||**Activity**||**Location to perform this test**||
    18 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||Padova / LBT cleanroom / LBT Platform||
    19 ||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||Padova / LBT cleanroom||
    20 ||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||Padova / LBT cleanroom?||
    21 ||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||Padova / LBT cleanroom / LBT Platform||
    22 ||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||Padova / LBT cleanroom / LBT Platform?||
    23 ||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||Padova / LBT cleanroom / LBT Platform?||
    24 ||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||Padova / LBT cleanroom||
    25 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova||
    26 
    27 **Templates**
    28 - SHARKNIR_cal_InstrumentBackground (not released)
    29 - SHARKNIR_gen_cal_InstrumentFlatField (not released)
    30 - SHARKNIR_lss_cal_Wavelength (not released)
    31 - SHARKNIR_gen_mon_ThermalBackground (not released)
    32 - SHARKNIR_di_mon_DetectorGain (not released)
    33 - SHARKNIR_ci_mon_DetectorPersistence (not released)
    34 - SHARKNIR_lss_mon_SpectraResolution (not released)
    35 - SHARKNIR_cal_mon_Ghost (not released)
    36 
    37 **Success criteria**
    38 - All calibrations are successfully tested.
    39 - All relevant information (files) are saved in the repository.
    40 
    41 **Notes**
    42 - The time dedicated to this activity has to be considered in combination with other activities. Parallelism is possible.
    43 
    44 **LBTO support**
    45 
    46 **Date performed and by whom**