== P2.8 Flexure tests == • **Phase** : 2 • **Status** : Draft • **Category** : Daytime testing (functionality and operability) (C2) • **Recurrence** : once at commissioning • **Duration** : 3 hour(s) **Description** • This activity corresponds to the flexure tests for the SHARK-NIR. **Prerequisites** • If relevant, estimate and remove the NCPA using phase-diversity method. • RR mounted on SX side. **Procedure** • Test the positions of the various opto-mechanical components within the instrument using optical feedback while moving the telescope in elevation. • Change the velocity and acceleration of the movement of the telescope in elevation if required. • Remember to perform the tests for all the observing modes (whatever possible with RR or internal light sources) • You may want to disentangle the flexure of the RR while moving the telescope in elevation by comparing the optical feedback for the same movement with the internal light source. • This test will also test the working of the LBTO AO system while the telescope is moving in elevation. • Compare the results with that of Padova flexure tests. **Success criteria** • All the images and data are saved for analysis or to create the lookup table. **Notes** • If the test results are not satisfactory, this activity may be repeated again after making proper countermeasures to reduce the flexure. **LBTO support** • Support from LBTI/LBTO? **Associated SHARK-NIR personnel** • JF, LM, MdP **Date performed and by whom**