Changes between Version 4 and Version 5 of docs/CommissioningPlan/P2.8
- Timestamp:
- 01/21/21 10:55:49 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v4 v5 9 9 • If required, this may be repeated for on-axis source from RR for selected or all filters while the AO loop is running (daytime) 10 10 **Prerequisites** 11 • If relevant, estimate and remove the NCPA using phase-diversity method.11 • If relevant, estimate and remove the NCPA using the phase-diversity method. 12 12 • RR mounted on SX side. 13 13 **Procedure** … … 21 21 • All the filter images saved. 22 22 **Notes** 23 • The time dedicated to this activity has to be considered in combination with the next activity ,if needed. Parallelism is possible.23 • The time dedicated to this activity has to be considered in combination with the next activity if needed. Parallelism is possible. 24 24 **LBTO support** 25 * Authorize SHARK-NIR on SX side.25 * Authorize SHARK-NIR on the SX side. 26 26 * RR mounted on the SX side. 27 27 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO