Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.8
- Timestamp:
- 01/19/21 11:02:56 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v2 v3 1 == P2.8 Flexure tests ==1 == P2.8 Looking for filter defects/effects/features == 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 3days6 • **Duration** : 2 days 7 7 **Description** 8 • This activity corresponds to the flexure tests for the SHARK-NIR. 8 • Finding the filter defects/effects/features using different lamps within the instrument. 9 • If required, this may be repeated for on-axis source from RR for selected or all filters while the AO loop is running (daytime) 9 10 **Prerequisites** 10 11 • If relevant, estimate and remove the NCPA using phase-diversity method. 11 12 • RR mounted on SX side. 12 13 **Procedure** 13 • T est the positions of the various opto-mechanical components within the instrument using optical feedback while moving the telescope in elevation.14 • Change the velocity and acceleration of the movement of the telescope in elevationif required.15 • Remember to perform the tests for all the observing modes (whatever possible with RR or internal light sources)16 • You may want to disentangle the flexure of the RR while moving the telescope in elevation by comparing the optical feedback for the same movement with the internal light source.17 • This test will also test the working of the LBTO AO system while the telescope is moving in elevation. 18 • Compare the results with that of Padova flexure tests. 14 • Take the images of all the filters using different lamps within the instrument to locate/find out the filter effects/defects/features. 15 • You may take short- and long-exposures to get better contrast of the features if required. 16 • This may be repeated with the on-axis source from the RR with AO running to check for any extra features arriving from outside SHARK-NIR but from LBT mirrors or the deployable arm. 17 • Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9]. 18 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Filter wheels reproducibility monitoring.] 19 19 20 **Success criteria** 20 • All the images and data are saved for analysis or to create the lookup table.21 • All the filter images saved. 21 22 **Notes** 22 • If the test results are not satisfactory, this activity may be repeated again after making proper countermeasures to reduce the flexure.23 • The time dedicated to this activity has to be considered in combination with the next activity, if needed. Parallelism is possible. 23 24 **LBTO support** 24 25 * Authorize SHARK-NIR on SX side. 25 * RR will be required on the SX side.26 * RR mounted on the SX side. 26 27 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO 27 28