    1  == P2.8 Star center Fourier mode images ==
     1 == P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM==
    22 
    33- **Phase**             :       2 
    44- **Status**            :       Draft   
    5 - **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    6 - **Recurrence**        :       once after instrument installation at telescope platform
    7 - **Duration**  :       0.5 day
     5- **Category**  :       Daytime testing (functionality and operability) (C3)
     6- **Recurrence**        :       once at commissioning
     7- **Duration**  :       3 days
    88
    99**Description**
    10 - This calibration is performed to calibrate the target star center with respect to the detector in order to provide a reference input for frame derotation and quadrant combination.
     10- Verify the efficiency of the mask-centering algorithm and the final contrast with SOUL-AO and artificial turbulence intruded at the ASM.
    1111
    1212**Prerequisites**
    13 - Authorize SHARK-NIR on the SX side.
    14 - Atmospheric conditions: AO working conditions.
    15 - Bad pixel map, Dark
     13- RR is mounted on the SX side.
    1614
    1715**Procedure**
    18 - TBW+TBC
    19 - DM (ASM/ALPAO-DM?) produces a pattern offset with four spots symmetric with respect to the star + AO closed-loop + coronagraph
    20 - The required specifications of the corresponding image are a grid of at least 2x2 regularly spaced focal plane image peaks within 5 and 15 lambda/D with FWHM < 45 mas and separation precision < 6 mas.
    21 - DM offset applied on target acquisition to produce a waffle image. Find the center of the four first-order diffraction peaks (cross geometry) to deduce the pixel corresponding to the center field.
     16- TBW
    2217
    2318**Templates**
    24 - SHARKNIR_gen_cal_StarCenter (not released)
    2519
    2620**Success criteria**
    27 - Accuracy of 3 mas (goal 1 mas)
     21- Final contrast produced for various seeing conditions matches the simulations.
    2822
    2923**Notes**
    30 - Same as activity 7.8 in AD4
    3124
    3225**LBTO support**
     26- Authorize SHARK-NIR on the SX side.
     27- RR is mounted on the SX side.
    3328- AO support
    3429