Changes between Version 15 and Version 16 of docs/CommissioningPlan/P2.8
- Timestamp:
- 02/04/21 23:28:05 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v15 v16 11 11 12 12 **Procedure** 13 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom . Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details.13 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom or at Padova cleanroom. Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details. 14 14 15 15 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]|| … … 24 24 **Success criteria** 25 25 • All calibrations successfully tested. 26 * All the read-out modes and windowing possibilities of the SCICAM are tested successfully.27 26 * All relevant information (files) are saved in the repository. 28 27 **Notes**