Changes between Version 6 and Version 7 of docs/CommissioningPlan/P2.7
- Timestamp:
- 01/21/21 10:55:10 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.7
v6 v7 8 8 • Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope 9 9 **Prerequisites** 10 • If relevant, estimate and remove the NCPA using phase-diversity method.10 • If relevant, estimate and remove the NCPA using the phase-diversity method. 11 11 • RR mounted on SX side. 12 12 **Procedure** … … 18 18 19 19 **LBTO support** 20 * Authorize SHARK-NIR on SX side.20 * Authorize SHARK-NIR on the SX side. 21 21 * RR mounted on the SX side. 22 22 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO