Changes between Version 3 and Version 4 of docs/CommissioningPlan/P2.7
- Timestamp:
- 01/19/21 10:50:20 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.7
v3 v4 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 1 hour(s)6 • **Duration** : 2 days 7 7 **Description** 8 8 • Finding the filter defects/effects/features using different lamps within the instrument. … … 15 15 • You may take short- and long-exposures to get better contrast of the features if required. 16 16 • This may be repeated with the on-axis source from the RR with AO running to check for any extra features arriving from outside SHARK-NIR but from LBT mirrors or the deployable arm. 17 • Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9] 18 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Monitoring]17 • Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9]. 18 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Filter wheels reproducibility monitoring.] 19 19 20 20 **Success criteria** … … 25 25 • Support from LBTI/LBTO? 26 26 **Associated SHARK-NIR personnel** 27 • JF, LM, MdP 27 28 28 29 **Date performed and by whom**