Changes between Version 2 and Version 3 of docs/CommissioningPlan/P2.7
- Timestamp:
- 01/19/21 10:48:35 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.7
v2 v3 16 16 • This may be repeated with the on-axis source from the RR with AO running to check for any extra features arriving from outside SHARK-NIR but from LBT mirrors or the deployable arm. 17 17 • Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9] 18 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Monitoring] 18 19 19 20 **Success criteria**