Changes between Version 27 and Version 28 of docs/CommissioningPlan/P2.7
- Timestamp:
- 12/02/22 09:39:13 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.7
v27 v28 1 == P2.7 SHARK-NIR system-level characterization at different telescope elevations==1 == [[span(style=color: green, **P2.7 SHARK-NIR system-level characterization at different telescope elevations** )]] == 2 2 3 3 - **Phase** : 2 4 - **Status** : Draft4 - **Status** : [[span(style=color: green, **COMPLETE (only for Zenith)** )]] 5 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 6 6 - **Recurrence** : once after instrument installation at telescope platform … … 60 60 61 61 **Date performed and by whom** 62 November 11th, 12th, 13th, 14th by Luca, Daniele, Elena, Davide R./Fulvio 62 - November 11th, 12th, 13th, 14th by Luca, Daniele, Elena, Davide R./Fulvio 63 64 **Results** 65 - Due to technical issues, the NCPA verification was only performed at Zenith for different SHARK-NIR derotation angles. The results are good and consistent. More details can be found in the log. Here is the [https://docs.google.com/document/d/1fYgeR-pu_lNgZE4gLrYJ3335OtDDleGAxxuGYEzEOm0/edit# link].