Changes between Version 27 and Version 28 of docs/CommissioningPlan/P2.7


Ignore:
Timestamp:
12/02/22 09:39:13 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.7

    v27 v28  
    1  == P2.7        SHARK-NIR system-level characterization at different telescope elevations ==
     1 == [[span(style=color: green, **P2.7   SHARK-NIR system-level characterization at different telescope elevations** )]] ==
    22
    33- **Phase**             :       2 
    4 - **Status**            :       Draft   
     4- **Status**            :       [[span(style=color: green, **COMPLETE (only for Zenith)** )]]   
    55- **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    66- **Recurrence**        :       once after instrument installation at telescope platform
     
    6060
    6161**Date performed and by whom**
    62 November 11th, 12th, 13th, 14th by Luca, Daniele, Elena, Davide R./Fulvio
     62- November 11th, 12th, 13th, 14th by Luca, Daniele, Elena, Davide R./Fulvio
     63
     64**Results**
     65- Due to technical issues, the NCPA verification was only performed at Zenith for different SHARK-NIR derotation angles. The results are good and consistent. More details can be found in the log. Here is the [https://docs.google.com/document/d/1fYgeR-pu_lNgZE4gLrYJ3335OtDDleGAxxuGYEzEOm0/edit# link].