Changes between Version 25 and Version 26 of docs/CommissioningPlan/P2.7


Ignore:
Timestamp:
09/29/22 10:58:21 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.7

    v25 v26  
    2222**Procedure for NCPA**
    2323- Start the tests with the telescope pointed to Zenith
    24  - Go to a specific derotation angle out of the five we wanted to calibrate/estimate the NCPA.
     24 - Go to a specific derotation angle out of the five (every 45 degrees over 180 degrees full travel) we wanted to calibrate/estimate the NCPA.
    2525   1. Using the Argos light source / RR light source, acquire the star at the SOUL WFS.
    2626   2. Introduce one of the seeing conditions (0" or 0.5" or 0.8"). Close the AO loop.