Changes between Version 25 and Version 26 of docs/CommissioningPlan/P2.7
- Timestamp:
- 09/29/22 10:58:21 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.7
v25 v26 22 22 **Procedure for NCPA** 23 23 - Start the tests with the telescope pointed to Zenith 24 - Go to a specific derotation angle out of the five we wanted to calibrate/estimate the NCPA.24 - Go to a specific derotation angle out of the five (every 45 degrees over 180 degrees full travel) we wanted to calibrate/estimate the NCPA. 25 25 1. Using the Argos light source / RR light source, acquire the star at the SOUL WFS. 26 26 2. Introduce one of the seeing conditions (0" or 0.5" or 0.8"). Close the AO loop.