Changes between Version 18 and Version 19 of docs/CommissioningPlan/P2.7


Ignore:
Timestamp:
09/21/22 12:43:30 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.7

    v18 v19  
    55- **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    66- **Recurrence**        :       once after instrument installation at telescope platform
    7 - **Duration**  :       6 days
     7- **Duration**  :       4 days
    88
    99**Description**