Changes between Version 16 and Version 17 of docs/CommissioningPlan/P2.7


Ignore:
Timestamp:
04/22/22 19:30:34 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.7

    v16 v17  
    55- **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    66- **Recurrence**        :       once after instrument installation at telescope platform
    7 - **Duration**  :       2 days
     7- **Duration**  :       0.5 day
    88
    99**Description**
     
    1616
    1717**Procedure**
    18 - DM produce a pattern offset with four spots symmetric with respect to the star + AO closed-loop + coronagraph
     18- TBW+TBC
     19- DM (ASM/ALPAO-DM?) produces a pattern offset with four spots symmetric with respect to the star + AO closed-loop + coronagraph
    1920- The required specifications of the corresponding image are a grid of at least 2x2 regularly spaced focal plane image peaks within 5 and 15 lambda/D with FWHM < 45 mas and separation precision < 6 mas.
    2021- DM offset applied on target acquisition to produce a waffle image. Find the center of the four first-order diffraction peaks (cross geometry) to deduce the pixel corresponding to the center field.