  • docs/CommissioningPlan/P2.7

    v11 v12  
    22•       **Phase**               :       2 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Daytime testing (functionality and operability) (C2)
     4•       **Category**            :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       3 days
     6•       **Duration**            :       1 day
    77**Description**
    88•       Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope
    99**Prerequisites**
    10 •       If relevant, estimate and remove the NCPA using the phase-diversity method.
    1110•       RR mounted on SX side.
    1211**Procedure**
    13 •       Need to define the procedure?
     12•       TBD
    1413
    1514**Success criteria**
    1615•       Estimate the pointing offset and conclude if it is acceptable or not. If not acceptable, take proper actions to overcome this issue.
    1716**Notes**
    18 
     17* This activity will be done along with P2.6
    1918**LBTO support**
    2019* Authorize SHARK-NIR on the SX side.