Changes between Version 11 and Version 12 of docs/CommissioningPlan/P2.7
- Timestamp:
- 02/04/21 21:31:59 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.7
v11 v12 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 • **Category** : Daytime testing (functionality and operability) (C 2)4 • **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 3 days6 • **Duration** : 1 day 7 7 **Description** 8 8 • Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope 9 9 **Prerequisites** 10 • If relevant, estimate and remove the NCPA using the phase-diversity method.11 10 • RR mounted on SX side. 12 11 **Procedure** 13 • Need to define the procedure?12 • TBD 14 13 15 14 **Success criteria** 16 15 • Estimate the pointing offset and conclude if it is acceptable or not. If not acceptable, take proper actions to overcome this issue. 17 16 **Notes** 18 17 * This activity will be done along with P2.6 19 18 **LBTO support** 20 19 * Authorize SHARK-NIR on the SX side.