Cryostat Cooldown and Science detector calibrations == - **Phase** : 2 - **Status** : Draft - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) - **Recurrence** : after instrument installation at telescope platform - **Duration** : 1 day **Description** - At the beginning of the next run, the cryostat is cooled down and the science detector calibrations are performed (when at the telescope). **Prerequisites** **Procedure** - For the cryostat cool down, follow P1.4 and P1.5 - For science detector calibrations follow P1.7 **Templates** **Success criteria** - Cryostat cooled down. - SHARK-NIR working normally. - Science calibrations are performed and new values are saved. **Notes** - Support from the Steward Observatory detector team. **LBTO support** - Follow P1.4 and P1.5 (for the cryostat cool down) **Date performed and by whom**