Changes between Version 8 and Version 9 of docs/CommissioningPlan/P2.6


Ignore:
Timestamp:
02/04/21 21:30:04 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.6

    v8 v9  
    22•       **Phase**               :       2 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Daytime calibration (C3)
     4•       **Category**            :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       10 days
     6•       **Duration**            :       5 days
    77**Description**
    88•       Measure the Non-Common Path Aberrations (NCPA).
     
    3737
    3838**Comments**
    39 * LM: I have to say I have some confusion here. I would like to discuss some points as probably I have things not clear in my mind.