Changes between Version 8 and Version 9 of docs/CommissioningPlan/P2.6
- Timestamp:
- 02/04/21 21:30:04 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v8 v9 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 • **Category** : Daytime calibration (C3)4 • **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 10days6 • **Duration** : 5 days 7 7 **Description** 8 8 • Measure the Non-Common Path Aberrations (NCPA). … … 37 37 38 38 **Comments** 39 * LM: I have to say I have some confusion here. I would like to discuss some points as probably I have things not clear in my mind.