Changes between Version 34 and Version 35 of docs/CommissioningPlan/P2.6
- Timestamp:
- 12/02/22 09:47:48 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v34 v35 1 == P2.6 Tip-Tilt internal fast loop test with ASM turbulence==1 == [[span(style=color: green, **P2.6 Tip-Tilt internal fast loop test with ASM turbulence ** )]]== 2 2 3 3 - **Phase** : 2 4 - **Status** : Draft4 - **Status** : [[span(style=color: green, **COMPLETE** )]] 5 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : after instrument installation at telescope platform … … 51 51 52 52 **Success criteria** 53 - SHARK-NIR fast tip-tilt loop works efficiently within the requirements in all the seeing conditions and magnitudes (compari son between open-close loop variation with differentinjected turbulence).53 - SHARK-NIR fast tip-tilt loop works efficiently within the requirements in all the seeing conditions and magnitudes (comparing open-close loop variation with different injected turbulence). 54 54 - The center of field estimated. 55 55 … … 62 62 63 63 **Date performed and by whom** 64 November 10th Luca, Daniele, Elena and remote support by Fulvio64 - November 10th Luca, Daniele, Elena and remote support by Fulvio