Changes between Version 33 and Version 34 of docs/CommissioningPlan/P2.6
- Timestamp:
- 11/07/22 17:17:49 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v33 v34 13 13 **Prerequisites** 14 14 - Argos light source magnitude tuning or ND filters internal to SHARK-NIR will be used to test different magnitudes. 15 - For the SN team: know in advance how many minutes of data can be downloaded from CRED2 or the ring-buffer size. At least barycenter position should be saved, in a format compatible with statistical analyses. Confirm if 10 mins are ok.15 - For the SN team: know in advance how many minutes of data can be downloaded from CRED2 or the ring-buffer size. At least barycenter position should be saved, in a format compatible with statistical analyses. 16 16 17 17 **Procedure for the Tip-Tilt internal fast loop test** … … 20 20 Test A1. 21 21 - Close the SHARK-NIR internal tip-tilt loop. 22 - Take 10mins (TBC) of data at the CRED2 (at loop frame rate) and SCICAM at 500 Hz.22 - Take 5mins of data at the CRED2 (at loop frame rate) and SCICAM. 23 23 - Introduce 0.5" seeing at the ASM and close the loop at 500 hz. 24 24 - Close the SHARK-NIR internal tip-tilt loop. … … 28 28 29 29 Test B1. 30 - Take 10mins (TBC)of data at the CRED2 and SCICAM.30 - Take 5mins of data at the CRED2 and SCICAM. 31 31 - Introduce 0.8" seeing at the ASM and close the loop. 32 32 - Close the SHARK-NIR internal tip-tilt loop. 33 - Take 10mins (TBC)of data at the CRED2 and SCICAM.33 - Take 5mins of data at the CRED2 and SCICAM. 34 34 35 35 Test B2.