Changes between Version 33 and Version 34 of docs/CommissioningPlan/P2.6


Ignore:
Timestamp:
11/07/22 17:17:49 (2 years ago)
Author:
lmarafatto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.6

    v33 v34  
    1313**Prerequisites**
    1414- Argos light source magnitude tuning or ND filters internal to SHARK-NIR will be used to test different magnitudes.
    15 - For the SN team: know in advance how many minutes of data can be downloaded from CRED2 or the ring-buffer size. At least barycenter position should be saved, in a format compatible with statistical analyses. Confirm if 10 mins are ok.
     15- For the SN team: know in advance how many minutes of data can be downloaded from CRED2 or the ring-buffer size. At least barycenter position should be saved, in a format compatible with statistical analyses.
    1616
    1717**Procedure for the Tip-Tilt internal fast loop test**
     
    2020Test A1.
    2121- Close the SHARK-NIR internal tip-tilt loop.
    22 - Take 10mins (TBC) of data at the CRED2 (at loop frame rate) and SCICAM at 500 Hz.
     22- Take 5mins of data at the CRED2 (at loop frame rate) and SCICAM.
    2323- Introduce 0.5" seeing at the ASM and close the loop at 500 hz.
    2424- Close the SHARK-NIR internal tip-tilt loop.
     
    2828
    2929Test B1.
    30 - Take 10mins (TBC) of data at the CRED2 and SCICAM.
     30- Take 5mins of data at the CRED2 and SCICAM.
    3131- Introduce 0.8" seeing at the ASM and close the loop.
    3232- Close the SHARK-NIR internal tip-tilt loop.
    33 - Take 10mins (TBC) of data at the CRED2 and SCICAM.
     33- Take 5mins of data at the CRED2 and SCICAM.
    3434
    3535Test B2.