    55- **Category**  :       Daytime testing (functionality and operability) (C3)
    66- **Recurrence**        :       after instrument installation at telescope platform
    7 - **Duration**  :       1 day
     7- **Duration**  :       1/2 day
    88
    99**Description**
     
    1111
    1212**Prerequisites**
    13 - Knowledge of Argos light source magnitude and the possibility to tune its brightness.
     13- Knowledge of Argos light source magnitude and the possibility of tuning its brightness.