  • docs/CommissioningPlan/P2.6

    v25 v26  
    55- **Category**  :       Daytime testing (functionality and operability) (C3)
    66- **Recurrence**        :       after instrument installation at telescope platform
    7 - **Duration**  :       0.5 day
     7- **Duration**  :       1 day
    88
    99**Description**
    10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions simulated at the ASM. This test will verify if the correction of the fast tip-tilt loop is affected by the residual turbulence for star at different magnitudes.
     10- To verify the SHARK-NIR internal fast tip-tilt loop (using CRED2 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions (0.5", 0.8") simulated at the ASM. This test will verify if the correction of the fast tip-tilt loop is affected by the residual turbulence for star at different magnitudes.
    1111
    1212**Prerequisites**
     
    3737- Authorize SHARK-NIR
    3838- Permission to use SX-ASM and LBTI-AO
     39- SOUL-LBTI AO support
    3940- AO support
    4041
    4142**Date performed and by whom**
     43November 10th Luca, Daniele, Elena and remote support by Fulvio