Changes between Version 25 and Version 26 of docs/CommissioningPlan/P2.6
- Timestamp:
- 10/28/22 16:12:00 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v25 v26 5 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : after instrument installation at telescope platform 7 - **Duration** : 0.5day7 - **Duration** : 1 day 8 8 9 9 **Description** 10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED 1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditionssimulated at the ASM. This test will verify if the correction of the fast tip-tilt loop is affected by the residual turbulence for star at different magnitudes.10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED2 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions (0.5", 0.8") simulated at the ASM. This test will verify if the correction of the fast tip-tilt loop is affected by the residual turbulence for star at different magnitudes. 11 11 12 12 **Prerequisites** … … 37 37 - Authorize SHARK-NIR 38 38 - Permission to use SX-ASM and LBTI-AO 39 - SOUL-LBTI AO support 39 40 - AO support 40 41 41 42 **Date performed and by whom** 43 November 10th Luca, Daniele, Elena and remote support by Fulvio