Changes between Version 12 and Version 13 of docs/CommissioningPlan/P2.6


Ignore:
Timestamp:
02/05/21 18:16:04 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.6

    v12 v13  
    44•       **Category**            :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       5 days
     6•       **Duration**            :       8 days
    77**Description**
    88•       Measure the Non-Common Path Aberrations (NCPA).