Changes between Version 12 and Version 13 of docs/CommissioningPlan/P2.6
- Timestamp:
- 02/05/21 18:16:04 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v12 v13 4 4 • **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 5days6 • **Duration** : 8 days 7 7 **Description** 8 8 • Measure the Non-Common Path Aberrations (NCPA).