Changes between Version 1 and Version 2 of docs/CommissioningPlan/P2.4


Ignore:
Timestamp:
01/18/21 16:42:02 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.4

    v1 v2  
    44•       **Category**            :       Daytime testing (functionality and operability)  (C2)                           
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       2 hour(s)
     6•       **Duration**            :       3 days
    77**Description**
    88•       SHARK-NIR is aligned to the telescope and daytime collimation model is acquired.
     
    2424•       Support from LBTI?
    2525**Associated SHARK-NIR personnel**
    26 •       JF, LM, MdP, MM (from AZ)
     26
    2727**Date performed and by whom**