Changes between Version 18 and Version 19 of docs/CommissioningPlan/P2.4


Ignore:
Timestamp:
09/13/22 15:20:22 (2 years ago)
Author:
mbergomi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.4

    v18 v19  
    3838**LBTO support**
    3939- Working platform installed in front of the Gregorian focal station SX.
     40- RR Iinstalled with NIRVANA Barilotto on the SX side  on first day of alignment
    4041- Argos swing arm and calibration source on SX side.
    4142- Support from the LBTI team.