== P2.10 Cryostat warm up check == - **Phase** : 1 - **Status** : Draft - **Category** : Daytime testing (functionality and operability) (C3) - **Recurrence** : at the end of every SHARK-NIR run? - **Duration** : 2 days **Description** - Checking the cryostat warming up procedure. **Prerequisites** - SHARK-NIR connected to LBT network. - Automatic logging of the cryostat temperature. **Procedure** - Run the cryostat warm-up sequence. - Check how the system is performing every 30 minutes. **Templates** **Success criteria** - Cryostat warmed up without any issues. - The temperature at the detector is stable at dome temperature. **Notes** **LBTO support** **Date performed and by whom**