     1== P2.10        Cryostat warm up check  ==
     2•       **Phase**               :       1 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Daytime testing (functionality and operability) (C2)
     5•       **Recurrence**  :       at the end of every SHARK-NIR run?
     6•       **Duration**            :       2 days
     7**Description**
     8•       Checking the cryostat warming up procedure.
     9**Prerequisites**
     10•       SHARK-NIR connected to LBT network.
     11•       Automatic logging of the cryostat temperature
     12**Procedure**
     13•       Run the cryostat warm up sequence
     14•       Check how the system is performing every 30 minutes
     15**Success criteria**
     16•       Cryostat warmed up without any issues.
     17•       The temperature at the detector is stable at ??
     18**Notes**
     19
     20**LBTO support**
     21
     22**Associated SHARK-NIR personnel**
     23
     24**Date performed and by whom**