Changes between Version 4 and Version 5 of docs/CommissioningPlan/P2.0B
- Timestamp:
- 01/14/22 14:49:17 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0B
v4 v5 1 == P2.0B Installation of SHARK-NIR at the LBT platform - 2== 2 • **Phase** : 2 3 • **Status** : Draft 4 • **Category** : Installation of SHARK-NIR at LBT platform (C2) 5 • **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) 6 • **Duration** : 2 days. 1 == P2.0B Installation of SHARK-NIR electronics on LBT platform== 2 3 - **Phase** : 2 4 - **Status** : Draft 5 - **Category** : Installation of SHARK-NIR at LBT platform (C2) 6 - **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) 7 - **Duration** : 2 days. 8 7 9 **Description** 8 • Installation of the electronics in the cabinets, cabling, and confirming the safety & security of the instrument and area. 10 - Installation of the electronics in the cabinets, cabling, and confirming the safety & security of the instrument and area. 11 9 12 **Prerequisites** 10 • SHARK-NIR (main parts) are installed on the LBTO platform (activity [wiki:/docs/CommissioningPlan/P2.0A P2.0A]). 13 - SHARK-NIR (main parts) are installed on the LBTO platform (activity [wiki:/docs/CommissioningPlan/P2.0A P2.0A]). 14 11 15 **Procedure** 12 • Look at the AD4 document for the procedure and details. 16 - Look at the AD4 document for the procedure and details. 17 13 18 **Success criteria** 14 • SHARK-NIR electronics successfully installed in the cabinets. 15 • Connect all the cables and secure them. 16 • Reassure all the connections, nuts, and bolts, etc. 17 * Confirm the safety and security of the instrument and the area. 19 - SHARK-NIR electronics are successfully installed in the cabinets. 20 - Connect all the cables and secure them. 21 - Reassure all the connections, nuts, bolts, etc. 22 - Confirm the safety and security of the instrument and the area. 23 24 **Templates** 25 18 26 **Notes** 19 Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater).27 - Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater). 20 28 21 29 **LBTO support** 22 • 1-2 crew members' support for the preparation and installation of SHARK-NIR electronics. 23 * Safety officer 24 * Kindly check the installation document, AD3, for more details 25 26 **Associated SHARK-NIR personnel** 30 - 1-2 crew members' support for the preparation and installation of SHARK-NIR electronics. 31 - Safety officer 32 - Kindly check the installation document, AD3, for more details 27 33 28 34 **Date performed and by whom** 29 30 **Comments**