Changes between Version 3 and Version 4 of docs/CommissioningPlan/P2.0B
- Timestamp:
- 02/04/21 21:25:39 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0B
v3 v4 8 8 • Installation of the electronics in the cabinets, cabling, and confirming the safety & security of the instrument and area. 9 9 **Prerequisites** 10 • SHARK-NIR (main parts) are installed on the LBTO platform ( P2.0A).10 • SHARK-NIR (main parts) are installed on the LBTO platform (activity [wiki:/docs/CommissioningPlan/P2.0A P2.0A]). 11 11 **Procedure** 12 12 • Look at the AD4 document for the procedure and details.