  • docs/CommissioningPlan/P2.0B

    v1 v2  
    66•       **Duration**            :       2 days.
    77**Description**
    8 •       Installation of the electronics cabinets, cabling, and confirming the safety & security of the instrument and area.
     8•       Installation of the electronics in the cabinets, cabling, and confirming the safety & security of the instrument and area.
    99**Prerequisites**
    1010•       SHARK-NIR (main parts) are installed on the LBTO platform (P2.0A).
     
    1212•       Look at the AD4 document for the procedure and details.
    1313**Success criteria**
    14 •       SHARK-NIR successfully installed at the LBT platform.
    15 •       Telescope is balanced.
     14•       SHARK-NIR electronics successfully installed in the cabinets.
    1615•       Connect all the cables and secure them.
    1716•       Reassure all the connections, nuts, and bolts, etc.
     
    2120
    2221**LBTO support**
    23 •       Crew members' support for the preparation, lift-off, and installation of SHARK-NIR electronics cabinet
    24 * Crane operator (mountain bay, LBT platform)
     22•       1-2 crew members' support for the preparation and installation of SHARK-NIR electronics.
    2523* Safety officer
    26 * Working platform installed in front of the Gregorian focal-station SX,
    27 * Hatch door SX on the UIAP platform removed ???
    2824* kindly check the installation document for more details
    2925