Changes between Version 1 and Version 2 of docs/CommissioningPlan/P2.0B
- Timestamp:
- 02/03/21 12:47:31 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.0B
v1 v2 6 6 • **Duration** : 2 days. 7 7 **Description** 8 • Installation of the electronics cabinets, cabling, and confirming the safety & security of the instrument and area.8 • Installation of the electronics in the cabinets, cabling, and confirming the safety & security of the instrument and area. 9 9 **Prerequisites** 10 10 • SHARK-NIR (main parts) are installed on the LBTO platform (P2.0A). … … 12 12 • Look at the AD4 document for the procedure and details. 13 13 **Success criteria** 14 • SHARK-NIR successfully installed at the LBT platform. 15 • Telescope is balanced. 14 • SHARK-NIR electronics successfully installed in the cabinets. 16 15 • Connect all the cables and secure them. 17 16 • Reassure all the connections, nuts, and bolts, etc. … … 21 20 22 21 **LBTO support** 23 • Crew members' support for the preparation, lift-off, and installation of SHARK-NIR electronics cabinet 24 * Crane operator (mountain bay, LBT platform) 22 • 1-2 crew members' support for the preparation and installation of SHARK-NIR electronics. 25 23 * Safety officer 26 * Working platform installed in front of the Gregorian focal-station SX,27 * Hatch door SX on the UIAP platform removed ???28 24 * kindly check the installation document for more details 29 25