Changes between Version 4 and Version 5 of docs/CommissioningPlan/P2.0A


Ignore:
Timestamp:
01/14/22 14:45:17 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.0A

    v4 v5  
    1 == P2.0A        Installation of SHARK-NIR at the LBT platform - 1==
    2 •       **Phase**               :       2 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Installation of SHARK-NIR at LBT platform (C2) 
    5 •       **Recurrence**  :       once (unless deemed necessary to remove SHARK-NIR from the telescope platform)
    6 •       **Duration**            :       2 days for preparation, 2 days for installation, and 1 day contingency.
     1== P2.0A        Installation of SHARK-NIR on LBT platform==
     2
     3- **Phase**             :       2 
     4- **Status**            :       Draft   
     5- **Category**  :       Installation of SHARK-NIR at LBT platform (C2) 
     6- **Recurrence**        :       once (unless deemed necessary to remove SHARK-NIR from the telescope platform)
     7- **Duration**  :       2 days for preparation, 2 days for installation, and 1 day contingency.
     8
    79**Description**
    8 •       Aligned SHARK-NIR is prepared for the Big-Lift and installed on the LBT platform.
     10- Aligned SHARK-NIR is prepared for the Big-Lift and installed on the LBT platform.
     11
    912**Prerequisites**
    10 •       SHARK-NIR is aligned and ready for the lift-off.
     13- SHARK-NIR is aligned and ready for the lift-off.
     14
    1115**Procedure**
    12 •       Look at the AD4 document for the procedure and details.
     16- Look at the AD3 document for the procedure and details.
     17
     18**Templates**
     19
    1320**Success criteria**
    14 •       SHARK-NIR successfully installed at the LBT platform.
    15 •       Telescope is balanced.
    16 •       Connect all the cables and secure them.
    17 •       Reassure all the connections, nuts, and bolts, etc.
     21- SHARK-NIR is successfully installed at the LBT platform.
     22- Telescope is balanced.
     23- Connect all the cables and secure them.
     24- Reassure all the connections, nuts, bolts, etc.
     25
    1826**Notes**
    19 Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from bearing before the installation can start. Please look into the AD4 document for details.
     27- Note that SHARK-NIR is NOT installed as a single piece. The cryostat has to be disassembled from the bearing before the installation can start. Please look into the AD3 document for details.
    2028
    2129**LBTO support**
    22 •       Crew members' support for the preparation, lift-off, and installation of SHARK-NIR
    23 * Crane operator (cleanroom, mountain bay, LBT platform)
    24 * Safety officer
    25 * Working platform installed in front of the Gregorian focal-station SX
    26 * Hatch door SX on the UIAP platform removed
    27 * Support for the installation of electronics in the LBTO cabinet
    28 * Kindly check the installation document, AD3, for more details
    29 
    30 **Associated SHARK-NIR personnel**
     30- Crew members' support for the preparation, lift-off, and installation of SHARK-NIR
     31- Crane operator (cleanroom, mountain bay, LBT platform)
     32- Safety officer
     33- Working platform installed in front of the Gregorian focal-station SX
     34- Hatch door SX on the UIAP platform removed
     35- Support for the installation of electronics in the LBTO cabinet
     36- Kindly check the installation document, AD3, for more details
    3137
    3238**Date performed and by whom**
    33 
    34 **Comments**