== P2.0 SHARK-NIR Open Cart Activities== • **Phase** : 2 • **Status** : Draft • **Category** : Unpack, Assemble, Verification, and Installation (C1) • **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) • **Duration** : 1 day **Description** • All activities to be done on the SHARK-NIR optical bench with the cart open. **Prerequisites** • SHARK-NIR personnel present **Procedure** - For each rotatory stage, PI116.DGH: - put 2 drops of oil. - leave the C-RED2 ND filter wheel as last since it requires dismounting the folding mirror and the lens. **Success criteria** • All activities successfully completed and tested the proper functioning, **Notes** **LBTO support** **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments**