== P2.0 Installation of SHARK-NIR at the LBT platform - 2== • **Phase** : 2 • **Status** : Draft • **Category** : Installation of SHARK-NIR at LBT platform (C2) • **Recurrence** : once (unless deemed necessary to remove SHARK-NIR from the telescope platform) • **Duration** : 2 days. **Description** • Installation of the electronics cabinets, cabling, and confirming the safety & security of the instrument and area. **Prerequisites** • SHARK-NIR (main parts) are installed on the LBTO platform (P2.0A). **Procedure** • Look at AD4 document for the procedure and details. **Success criteria** • SHARK-NIR successfully installed at the LBT platform. • Telescope is balanced. • Connect all the cables and secure them. • Reassure all the connections, nuts and bolts, etc. * Confirm the safety and scuory of the instrument and the area. **Notes** Note that one (or two) rack(s) of the SHARK-NIR electronics are installed within the LBTO electronics cabinets (shared with LBTI and iLocater). **LBTO support** • Crew members' support for the preparation, lift-off, and installation of SHARK-NIR electronics cabinet * Crane operator (mountain bay, LBT platform) * Safety officer * Working platform installed in front of the Gregorian focal-station SX, * Hatch door SX on the UIAP platform removed ??? * kindly check the installation document for more details **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments** LM: this seems to be a duplicate of 2.0A. Please check.