== P1.9 Internal tip-tilt loop verification == - **Phase** : 1 - **Status** : Draft - **Category** : Unpack, Assemble, and Verification (C1) - **Recurrence** : once at commissioning - **Duration** : 1 day **Description** - Check the working of the internal tip-tilt loop using calibration unit light sources, C-RED2, and ALPAO-DM. **Prerequisites** - SCICAM cooled down. **Procedure** - Run the internal tip-tilt loop routine for different brightness of the source (star). - Check its efficiency in keeping the PSF at the C-RED2 hot-pixel. - Save data to the repository and analyze them. **Templates** **Success criteria** - Internal tip-tilt routine works fine and the PSF ar C-RED2 is stable within the required precision. - All the data and analysis are saved in the repository. **Notes** **LBTO support** - Liquid Nitrogen refill is required in the cleanroom. **Date performed and by whom**